• The integration maximizes the efficiency of downloading past building load data directly from the utility, which gives engineers a more accurate view of past usage and peak requirements of their project.
• The more exact the interval load data, the more precise the model, as the number of assumptions made during the optimization can be greatly reduced.
• The integration reduces engineering hours through programmatically loading data, ensuring that the solution will be more tailored to the needs of the building.
Among the news from AMC Networks’ TCA Press Tour presentation, six original series have been renewed across its bouquet of streaming services, including shows from AMC+, Acorn TV and Shudder.
MADISON (WKOW) People who visit the Wisconsin Veterans Museum over the next month will have a chance to check out some objects veterans have collected while serving in the