A plan to reconstruct a heavily traveled section of 16th Street Southwest is continuing on its way toward 2025 construction. The Minot City Council on Monday a
(Grand Forks, ND) A preliminary design for the new 42nd Street underpass has been selected by the Grand Forks City Council. The council recently picked "design B1" out of five proposed designs that were presented. The B1 design would re-configure the intersection at the location in question, which has the lowest cost and would allow for better traffic flow between 42nd