Phase 2 Surface Drilling Completed Alba Mineral Resources plc (AIM: ALBA) is pleased to provide an update on its ongoing activities at the Clogau-St David s Gold Mine ( Clogau or the Mine ). Phase 2 Surface Drilling Completed · Ten holes drilled for 1,475.6 m. All holes to date have intersected the Main Lode Extension. · JW008 intercepted the best developed example of the Main Lode extension including an intercept of ~3.40 m from ~49.90 m. · Galena has been identified in this intercept, an indicator mineral for gold-bearing veins and previously associated with high gold grades. · Main Lode Extension now projected to have strike length of 585 m and a depth extent of 63 m below surface.