Jervois Mining provides Ugandan Exploration Update
HIGHLIGHTS – Six diamond drill holes completed at Kilembe to test the high-grade Cu-Au anomalies during Q4 2020. All results have now been received. Result highlights include: – Hole 20DDHS006 – 2.0m @ 6.0 grams per tonne gold from 147.4m – Hole 20DDHS007 – 24.8m @ 0.9 gt Au from 53.7m Including 1.05m @ 6.4 gt Au; from 77.45m – Hole 20DDHS008 – 10.4m @ 0.6 gt Au from 14.0m – 1.65m @ 1.6 gt Au from 69.15m – Hole … (TheNewswire) HIGHLIGHTS – Six diamond drill holes (totaling 943 metres) completed at Kilembe to test the high-grade Cu-Au anomalies (CC Target) during Q4 2020. All results have now been received. Result highlights include: – Hole 20DDHS006 – Hole 20DDHS007