comparemela.com

Latest Breaking News On - Cerro chiquit - Page 1 : comparemela.com

Pampa Metals Corp : Pampa Metals Reports IP Chargeability Anomalies from the Cerro Chiquitin Target at Cerro Buenos Aires and Plans Further Drill Testing of Shallow & Deep Porphyry Targets

Pampa Metals Corp : Pampa Metals Reports Positive Assay Results from Its Cerro Buenos Aires Drill Program Confirming Zonation Towards a Porphyry System

Pampa Metals Reports Positive Assay Results from Its Cerro Buenos Aires Drill Program Confirming Zonation Towards a Porphyry System

Pampa Metals Corp : Pampa Metals Mobilises Drill Rig to its Cerro Buenos Aires Project After Completing More Than 1,900m in 7 Holes at Redondo-Veronica

(1) VANCOUVER, BC / ACCESSWIRE / July 29, 2021 / Pampa Metals Corp. ( Pampa Metals or the Company ) (CSE:PM)(FSE:FIRA)(OTCQX:PMMCF) is pleased to report that it has completed its drill program at its Redondo-Veronica project, with a total of 1,956 meters drilled in 7 reverse circulation ( RC ) holes, and has now mobilised the drill rig and support team to its Cerro Buenos Aires project. RC drill chips from every 2m sample drilled into rock at Redondo-Veronica (excepting chips from post-mineral overburden) have been bagged and are in the process of being shipped to the sample preparation laboratory in Chile. A total of 926 2m field samples are being shipped. An additional 118 control samples, representing more than 12.5% of the field samples, and comprising blanks, duplicate samples, and certified value standards, have been randomly inserted into the sample batches for each drill hole and will be assayed by the same method as the field samples, in order to monitor and control the

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.