For motorists traveling across the Golden State (5) Freeway, the new bridge features three through lanes and two left turn lanes in each direction to access the highway. The bridge also includes bicycle lanes and a 10-foot sidewalk for pedestrians on the south side.
For motorists traveling across the Golden State (5) Freeway, the new bridge features three through lanes and two left turn lanes in each direction to access the highway. The bridge also includes bicycle lanes and a 10-foot sidewalk for pedestrians on the south side.
Updated on July 7, 2021 at 6:39 am
AOS Architects
Lanes on the 5 Freeway will be closed overnight from Tuesday night until Saturday morning, to construct the Burbank Boulevard Bridge, Caltrans announced.
The northbound lanes of the 5 Freeway will be closed on the first two nights: Download our mobile app for iOS or Android to get the latest breaking news and local stories.
from 11:59 p.m. Tuesday, July 6 until 4 a.m. on Wednesday, July 7
from 11:59 p.m. Wednesday, July 7 until 4 a.m. on Thursday, July 8
Southbound lanes will closed on the second two nights:
from 11 p.m. Thursday, July 8 until 5 a.m. on Friday, July 9