The 10km-long Metro 10 line will ensure direct connectivity between Metro 4 and Mira Road. The new line will start at Gaimukh, when line 4A reaches its peak, and conclude at Mira Gaon. The project is expected to be finished in 36 months., Mumbai News, Times Now