The construction of the 3.1-kilometre-long bridge connecting Aguani in Khagaria district with Sultanganj in Bhagalpur began in 2014 and was expected to be completed in 2019. The deadline has since been extended four times
So far, no casualties have been reported. A portion of a bridge that was built across the Burhi Gandak River in Sahebpur Kamal of Bihar s Begusarai district collapsed and fell into the river