The missing link', which will consist of a cable-stayed bridge, a viaduct, and two tunnels and reduce distance and travel time, will be finished by December 2023 or early 2024. After it is completed, it will be possible to bypass the ghats, not have to worry about falling boulders during the monsoon while driving past steep slopes, and travel at up to 120 kmph on the Mumbai-Pune expressway., Mumbai News, Times Now
Along with the presence of Kempegowda International Airport, upcoming metro and road connectivity and the presence of big tech companies, North Bengaluru has become an emerging hub in the city. , Bengaluru News, Times Now
In response to numerous videos surfacing on social media showing drivers traveling in the wrong direction on the Bengaluru-Mysuru Expressway, Karnataka s additional director general of police (traffic and road safety), Alok Kumar, has announced that license cancellations are being considered for those found driving recklessly on the expressway., Bengaluru News, Times Now
In response to numerous videos surfacing on social media showing drivers traveling in the wrong direction on the Bengaluru-Mysuru Expressway, Karnataka's additional director general of police (traffic and road safety), Alok Kumar, has announced that license cancellations are being considered for those found driving recklessly on the expressway., Bengaluru News, Times Now