comparemela.com

Latest Breaking News On - Bazenheid primary school schwabe suter architekten - Page 1 : comparemela.com

Bazenheid Primary School / Schwabe Suter Architekten

© Roman Keller By introducing new access between the existing and the new building, the primary school Bazenheid will have its own entrance and appropriate addressing. The new playground is located on the backside of the school, protected from the road, between the new and the old building. In addition to a classic playground with hard surfaces, play, and seating facilities, the outdoor facilities will be completed by three themed spaces dedicated to nature education.  © Roman Keller Room configuration. The new school building is accessible via a spacious, covered entrance area. Directly adjacent to the entrance hall we find two workrooms and the teachers work preparation room.  Three classrooms with two group rooms are also located on the ground floor and form the first learning cluster.  The upper floor is reachable via two staircases. Two further clusters, each with three classrooms and two group rooms, are located on the upper floor.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.