Named “The Statue of Valour”, the statue is part of the Lachit Barphukan Maidam Development Project that also includes a museum, a 500-seating capacity auditorium and a hostel. Apart from contributing towards tourism potential of the area, the 125-feet tall statue of the great general is also expected to inspire newer generation with the patriotism and love for their motherland.
Bhubaneswar: Ace Energy Infrastructure Pvt. Ltd., a part of Mumbai based Ace Pipeline Group, completed a vital link in the Barauni-Guwahati Natural Gas Pipeline being executed by GAIL (India) Limited as part of Pradhan Mantri Urja Ganga project, by c
This marks the end of micro tunnelling in the project, with Ace Energy now having completed construction of a tunnel of diameter 1600 mm across a total length of 1200 meters at a depth of 11-12 meters under the river bed, with strata consisting of extremely hard and abrasive boulders and a river flowing upto its brim for the past three months owing to the flooding in its upper reaches in Bhutan.