Impacted lines. We are working to get those repairs fix. Reporter some of the bad weather leading to the shut off and the damage that occurred cut a large circuit that served a wide area. Even in some areas with no wind issues power was interrupted nonetheless. A transition line can extend 100 miles and sometimes the terrain is treacherous. Our crews get out there and they inspect every inch of the line we deenergized. Reporter in anticipation of having power poles fail in the high wind areas, pg e put stores of extra poles around. Turns out that here on panoramic highway they actually needed one they had to replace. Pg e knows how frustrating it is to be without power. We know what it is like. We live and work in these communities and we understand it can be challenging. Pg any has no definitive answer on when the work will be done. But repairs will speed up as they get more work done. There are plenty of crews to get it done faster. Tom baker, ktvu fox 2 news. In santa rosa, some bus
SOCHI. KAZINFORM – The heads of Kazakhstan’s Shymbulak, Uzbekistan’s Amirsoy, and Russia’s Roza Khutor mountain resorts signed a memorandum to create the Eurasian Alliance of Mountain Resorts (EAMR), Kazinform reports.
In United States v. Kukushkin, the Second Circuit (Pooler, Lohier, and Nathan) affirmed the conviction of Andrey Kukushkin for conspiring to illegally donate monies to a political.