comparemela.com

Andrewj Ramcharan News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Uranium Co Reaches for the Sky Amid Russian Withdrawal

Big Red Mining Corp (RED) Announces Appointment of Dr Andrew J Ramcharan to Its Advisory Board

Roscan Gold Corporation: Roscan Gold Significantly Increases Depth and Continuity of Mineralization Along Strike of 600m at Kabaya; All 52 Holes Drilled since Acquisition Intersect Gold Mineralization

(0) TORONTO, ON / ACCESSWIRE / May 4, 2021 / Roscan Gold Corporation ( Roscan or the Company ) (TSXV:ROS)(FSE:2OJ)(OTC PINK:RCGCF) is pleased to announce positive DD/RC/AC drill results (Figure 1) from an additional 42 holes (29 DD and RC for 5,799m) totaling 6,500 meters (m) (Figure 1) at its Kabaya Target with all holes hitting gold mineralization (Table 1). At the time of acquisition on July 3, 2020, Kabaya s NI43-101 resource was pit-constrained to a depth of 58m. Since the acquisition, all 52 holes DD/RC drilled by Roscan have intersected gold mineralization showing the remarkable continuity and consistency of the deposit. Our January 2021 drilling update (see News Release 19

Roscan Gold Intersects 7 52gpt over 19m including 21 28gpt over 5m at the Recently Discovered High-Grade Zone 150m West of Mankouke South

Provided by Accesswire Apr 19, 2021 10:00 AM UTC TORONTO, ON / ACCESSWIRE / April 19, 2021 / Roscan Gold Corporation ( Roscan or the Company ) (TSXV:ROS)(FSE:2OJ)(OTC PINK:RCGCF) is pleased to announce positive Diamond and RC drill results (Figure 1) from an additional 12 holes totaling 2,205 meters (m) at our Southern Mankouke Zone (MS1 and MS2). Mankouke Discovery Zone (MS2) DDMan21-93 intersected 7.52gpt over 19m from 24.6m (Figure 2) including 21.28gpt over 5m at the recently discovered Mankouke South Discovery Zone (MS2 - March 8, 2021. 4.78 gpt over 24 m in DDH 89) which lies 150m West of the Main Mankouke South Zone (MS1). This new zone is open along strike and at depth. This hole, coupled with RCMAN21-17 (Table 1) which intersected 1.63 gpt gold over 19 m, expands the strike length of the new zone (MS2) to 100 meters and not only remains open but identifies the potential to expand the resource footprint to the north west and connect to our recently a

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.