After inspecting the proposed expansion of MR-4 and RW1, the collector discussed the matter with the industrialists on- the-spot and also ordered the officials to resolve their problems.
Industrialists demand to collector to build it 24 metres instead of 30 metres. Collector tells tehsildar to have revised road demarcation as per new width.