comparemela.com

Latest Breaking News On - Alabama coosa project management office - Page 1 : comparemela.com

Mechanical Issue At Mobile River Bridge Forces Closure - The Waterways Journal

Coffeeville Lock On Black Warrior-Tombigbee Waterway Closes For Emergency Repairs

April 21, 2021 By Frank McCormack The Mobile Engineer District announced April 14 the emergency closure of Coffeeville Lock at Mile 116.6 of the Black Warrior-Tombigbee Waterway (BWT) due to damage to the lower miter gate’s operating machinery, which rendered the lower gate inoperable. Chad Brumelow with the BWT/Alabama-Coosa Project Management Office said the closure was triggered by a crack in the reaction roller assembly for the lower miter gate. “It wasn’t any kind of one incident,” Brumelow said. “This was a crack in a reaction roller assembly, so more than likely it’s long-term fatigue that caused the cracking.” Brumelow said the lock, which is the lowermost lock on the system, will likely be closed four to five days, with a targeted reopening of April 19.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.