September 21, 1939: Chaska may now boast of having one of the largest neon signs in this section of the state within its confines. When electricity flowed into the high
Building energy flexibility is being considered an emerging strategy allowing the demand side actively support the operation and control of variable resources-based energy supply. This study presents the development of a framework to formulate and aggregate energy flexibility indicators (EFIs) to evaluate building energy flexibility. EFIs were developed/selected using the important characteristics of building energy flexible sources, performance factors linked with flexibility services and penalty factors posed by the grid. A multicriteria decision analysis method was then used to develop an Aggregated Energy Flexibility Potential (AEFP) function that can consider the interactions between the power grid, buildings and building energy systems to represent the building's overall energy flexibility potential with a single dimensionless value. AEFP can help determine cost-effective energy flexible sources and solutions for increased energy flexibility. The performance of the EFIs and
American Integrity will use Opterrix’s platform and actionable insights to enhance risk selection, exposure management, and event response in Florida.
The proposed natural gas aggregation program for the City of Lima will not appear on the November 7th ballot but will be revisited over the coming months.