comparemela.com

The deadline for completion of the 13 km-long Zojila Tunnel, the longest of its kind in Asia and at the highest altitude, has been pushed back to December 2030 due to difficulties posed by weather and terrain. The tunnel project, running through the Zojila Pass at an altitude of 11,578 feet on the Srinagar-Kargil-Leh National Highway, is of strategic importance as highway closures during winter due to snowfall cut off the Ladakh region from Kashmir.

Related Keywords

Zojila ,Jammu And Kashmir ,India ,Ganderbal ,Baltal ,United States ,Zojila Pass ,America ,Narendra Modi ,Ladakh Kargil ,Imtiaz Ahmed ,Cabinet Committee On Economic Affairs ,Border Roads Organisation ,Srinagar Kargil Leh National Highway ,Megha Engineering ,Infrastructure Limited ,North America ,Minister Narendra Modi ,Cabinet Committee ,Economic Affairs ,Sonamarg To Baltal ,Megha Engineering And Infrastructure Limited ,Ahmed ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.