comparemela.com


Share this article
The Wärtsilä Hybrid Upgrade solution, has been selected for retrofitting two offshore construction vessels owned by Norwegian operator Østensjø Rederi. The upgrading project will allow less use of the ships’ engines with correspondingly lower levels of exhaust emissions while operating in dynamic positioning (DP) mode, and will also lower emission levels in all other operational modes. The order with the technology group Wärtsilä was placed in the third quarter of 2020.
The two ships, the ‘Edda Fauna’ and ‘Edda Flora’, were built in 2008. The customer opted for the Wärtsilä Hybrid Upgrade solution in order to give the ships a more attractive environmental profile for potential charterers. The Wärtsilä Hybrid Upgrade solution will include the company’s new electronic DC bus-link, which allows a vessel to operate in DP 2 and 3 modes with a closed DC bus in hybrid, and an open bus on the AC system. The reduced running of the engines saves fuel and lessens the carbon footprint, while engine maintenance requirements are also alleviated.

Related Keywords

Norway ,Norwegian ,Helge Solberg ,Egil Arne Skare , ,Hybrid Upgrade ,Edda Fauna ,Edda Flora ,Chief Project Officer ,Towards Zero Emissions ,Senior Proposal Engineer ,Hybrid System ,Marine Power ,Smart Marine ,நோர்வே ,ஹெல்ஜ் சோல்பெர்க் ,கலப்பு மேம்படுத்தல் ,எட்டா விலங்கினங்கள் ,எட்டா தாவரங்கள் ,தலைமை ப்ராஜெக்ட் அதிகாரி ,நோக்கி பூஜ்யம் உமிழ்வு ,மூத்தவர் ப்ரபோஸல் பொறியாளர் ,கலப்பு அமைப்பு ,கடல் பவர் ,புத்திசாலி கடல் ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.