16.10.2023 - Two approved core wells are designed to confirm the depth of the salt structures and attain the geological properties of the salt and non-salt rocks, with drilling expected to begin October, 2023VANCOUVER, British Columbia, Oct. 16, 2023 (GLOBE ... Seite 1