KUALA LUMPUR: Jentayu Sustainables Bhd (JSB) announced that Telekosang Hydro Two Sdn Bhd has notified that the Telekosang Hydro 2 (TH2) run-of-river hydropower plant with a capacity of 16 megawatts (MW) has achieved its feed-in-tariff commencement date (FiTCD) as of Dec 25, 2023.