Tamboran Announces Spud of Tanumbirini #2H on EP 161
Announces Spud of Tanumbirini #2H on EP 161Sydney, May 10, 2021 AEST (ABN Newswire) - Tamboran Resources Limited ("Tamboran" or the "Company") is pleased to announce that the Tanumbirini #2H horizontal gas well commenced drilling operations.
Highlights
- Tanumbirini #2H drilling commenced on EP 161
- Well targets ~4,800 metre total depth ("TD") and will be hydraulically fracture-stimulated with 10-20 stages across the Mid-Velkerri B shale horizontal sections with an extended flow test to follow
- Drilling anticipated to complete in Q3 2021
Located on EP 161 in the core of the Beetaloo Sub-basin in the Northern Territory, Tanumbirini #2H is a horizontal well that will be directionally drilled to approximately ~4,800 metres total measured depth (TD) targeting the Mid-Velkerri B shale. Tamboran expects drilling to complete in Q3 2021. The rig will then drill Tanumbirini 3H to a similar TD, prior to hydraulically fracture-stimulating both wells. The frac will comprise 10-20 stages in the horizontal sections of each well, followed by completion and flow tests. Results from the two-well drilling and testing program are anticipated to be announced in Q3 2021.