Talisker Resources Ltd.: Talisker Extends High-Grade Gold Mineralisation 750m Down Plunge at King Block, Bralorne Gold Project
Talisker's first hole drilled proximal to the historic King Mine.
Previously released: The C Vein was intersected at 322.30m and produced an intercept of 8.42 g/t Au over 5.00m, including high values of 37.4 g/t Au over 0.50m from 323.10m, and 31.60 g/t Au over 0.50m from 326.80m depth.
The King Vein was intersected at 548.00m and produced an intercept of 4.49 g/t Au over 2.00m, including 6.12 g/t Au over 1.00m from 548.00m.
An Unknown Vein was intersected at 755.95m and produced an intercept of 5.37 g/t Au over 0.80m.