comparemela.com


Advertisement
Highlights
Rolling 12 month total recordable injury frequency rate (TRIFR) at 5.1, down from 10.6 in the prior corresponding period.
Rate of mine (ROM) coal mining performance of 514 000 t for the quarter, reflecting a reduction in fleet capacity.
The Isaac Downs environmental impact statement (EIS) assessment report was finalised by the Department of Environment and Science (DES) and posted on the DES website.
Safety performance
During the March quarter, there was one recordable injury at Issac Plains, with no other injuries recorded at Stanmore’s other projects and tenements. The 12 month rolling TRIFR at the end of 1Q21 was 5.1.
Stanmore continued to operated in the quarter with reset and reduced fleet capacity focusing on higher productivity and lower cost mining equipment and on minimising strip ratios and cost.

Related Keywords

Australia ,Stanmore ,Queensland , ,Peabody Energy Australia ,Department Of Environment ,Stanmore Coal ,Isaac Downs ,Issac Plains ,Isaac Plains East ,Bulk Sample Pit ,Mineral Resources Act ,Peak Downs Highway ,Mavis Downs Mine ,Goal ,Ining ,Line ,Inance ,Business ,Safety ,ஆஸ்திரேலியா ,ஸ்டான்மோர் ,குயின்ஸ்லாந்து ,பீபாடீ ஆற்றல் ஆஸ்திரேலியா ,துறை ஆஃப் சூழல் ,ஸ்டான்மோர் நிலக்கரி ,ஐஸ்யாக் தாழ்வுகள் ,ஐஸ்யாக் சமவெளி கிழக்கு ,தாது வளங்கள் நாடகம் ,உச்சம் தாழ்வுகள் நெடுஞ்சாலை ,இநெ ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.