The construction of the Third Vashi Creek Bridge is 51% complete, according to the Maharashtra State Road Development Corporation (MSRDC). The bridge, which is expected to be completed in 2024, will help to smoothen traffic between Mumbai and Navi Mumbai. The bridge will have six lanes in each direction, increasing the total number of lanes between the two cities from six to 12. , Mumbai News, Times Now