PWD promises to repair joints on North overbridge soon
Updated:
Updated:
Bridges wing submits estimate of ₹5 lakh for work
Share Article
Bridges wing submits estimate of ₹5 lakh for work
The gaps that have been developing between embankment and girders of Ernakulam North overbridge will be repaired shortly by the Public Works Department (Bridges wing).
The four-lane bridge was built in 2013 by Delhi Metro Rail Corporation Ltd. (DMRC), as part of Kochi metro’s preparatory works. Its defect-liability period expired a year later. Motorists — especially two and three-wheeler riders — have ever since been complaining of the gaps at either end of the bridge, which hamper a smooth ride through its surface.