Figure 1 Ondundu Project Overview with recent drill results (ONDD22-225 and ONDD22-226 were reported previously). Figure 2 Razorback target, showing assay results of recently drilled infill and step-out holes. Figure 3 Section one across Razorback Main Zone – looking north Figure 4 Section two across Razorback Main Zone – looking north Highlights A total of 3,148m of Reverse Circulation (RC) drilling was completed in fifteen holes since the publication of the Ondundu maiden mineral resource esti