VANCOUVER, British Columbia, May 25, 2021 (GLOBE NEWSWIRE) —
Prime Mining Corp. (“Prime” or the “Company”) (TSX-V: PRYM), (OTCQB: PRMNF), (Frankfurt: A2PRDW), announces additional positive results from its continuing 15,000-metre first phase drill program (“Phase 1”) at its wholly owned Los Reyes gold-silver project in Sinaloa state, Mexico. The results include new drill core assays from the Guadalupe East and Zapote South deposits which are two of eight known gold-silver deposits that comprise the current mineral resource at Los Reyes. Twelve drill holes are being reported on, including seven holes from Guadalupe East, and five holes from Zapote South (see Figure 1). An additional four drill holes have also been completed at Guadalupe East, each encountering the Estaca vein, with assays pending. A seventh drill rig has been added to the project as the Company pursues completion of Phase 1 drilling prior to the upcoming rainy season.