comparemela.com


Mid-Barataria sediment diversion project up for comment
March 8, 2021,
by
Zlatan Hrvacevic
The single largest ecosystem restoration project in U.S. history reached a significant milestone last week when the Army Corps released the Draft Environmental Impact Statement (DEIS) for the Mid-Barataria Sediment Diversion.
Before the DEIS, the Coastal Protection and Restoration Authority of Louisiana (CPRA) applied to USACE for permits and permission to construct, maintain and operate the Mid-Barataria Sediment Diversion project on the west bank of the Mississippi River in Plaquemines Parish.
This Louisiana Coastal Master Plan project will reconnect the Mississippi River to adjacent wetlands to build and maintain tens of thousands of acres of land in the Barataria Basin, which is experiencing one of the highest rates of land loss on the planet.

Related Keywords

Louisiana ,United States ,Mississippi River , ,Army Corps ,Restoration Authority Of Louisiana ,Draft Environmental Impact Statement ,Mid Barataria Sediment ,Coastal Protection ,Restoration Authority ,Mid Barataria Sediment Diversion ,Louisiana Coastal Master Plan ,Barataria Basin ,Draft Restoration Plan ,லூசியானா ,ஒன்றுபட்டது மாநிலங்களில் ,மிசிசிப்பி நதி ,இராணுவம் கார்ப்ஸ் ,மறுசீரமைப்பு அதிகாரம் ஆஃப் லூசியானா ,வரைவு சுற்றுச்சூழல் தாக்கம் அறிக்கை ,நடுவில் பாரடாரியா வண்டல் ,கடலோர ப்ரொடெக்ஶந் ,மறுசீரமைப்பு அதிகாரம் ,நடுவில் பாரடாரியா வண்டல் திசை திருப்புதல் ,லூசியானா கடலோர குரு திட்டம் ,பாரடாரியா பேசின் ,வரைவு மறுசீரமைப்பு திட்டம் ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.