McDermott will remove the existing flexible gas lift riser and perform the installation and commissioning of a new dynamic riser section and flowline comprised of two thermoplastic composite pipe jumpers. This will enable gas delivery to a subsea production system tied back to the Kikeh FPSO vessel.