comparemela.com


24th April 2021
The Department of Transport has been advised of a route clearance and pre-lay grapnel run, on behalf of SubCom LLC, across the pathway of the Grace Hopper subsea fibre optic cable system route in the Irish EEZ.
Operations were set to begin today, Saturday 24 April and will continue to Friday 30 July, weather depending, and will be conducted by the Nautilus (callsign EAOL). The vessel will be listening to VHF Channel 16 but can be set to any other as required.
Nautilus will be towing stern-deployed equipment and will be restricted in manoeuvrability. All vessels operating within this area are requested to keep their distance, and pass at minimum speed to reduce vessel wash.

Related Keywords

Ireland ,Irish ,Grace Hopper , ,Marine Notice ,Rapnel Run ,Fibre Optic Cable ,ஐயர்ல்யாஂட் ,ஐரிஷ் ,கருணை ஹாப்பர் ,கடல் அறிவிப்பு ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.