comparemela.com


March 16 from 9 p.m. to 5 a.m.
March 18 from 9 p.m. to 5 a.m.
Alternating, single-lane closures southbound on March 20 from 9 p.m. to 8 a.m.
HRBT Expansion Project:
Elizabeth River Tunnels (Downtown/Midtown tunnels):
Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
I-64 Widening Segment III Project, York County:
Single-lane closures on I-64 east and west from Route 199/Lightfoot (Exit 234) to Route 199/Humelsine Parkway (Exit 242) as needed March 14-18 starting as early as 7 p.m. to 5 a.m.
Lane closures under flagger control on Lakeshead Drive at the I-64 overpasses March 15-19 from 8 a.m. to 4 p.m.

Related Keywords

,Virginia Department Of Transportation ,Hampton Roads ,High Rise ,James River ,Virginia Department ,Roads Bridge Tunnel ,Merrimac Memorial Bridge Tunnel ,River Tunnels ,Elizabeth River Tunnels ,Downtown Tunnel ,Midtown Tunnel ,York County ,Humelsine Parkway ,Lakeshead Drive ,Fenton Mill Road ,Merrimac Trail ,High Rise Bridge Expansion ,South Military Highway ,Greenbrier Parkway ,Improvements Project ,Virginia Beach ,Newtown Road ,Grayson Road ,Witchduck Road ,வர்ஜீனியா துறை ஆஃப் போக்குவரத்து ,ஹாம்ப்டன் சாலைகள் ,உயர் உயர்வு ,ஜேம்ஸ் நதி ,வர்ஜீனியா துறை ,சாலைகள் பாலம் சுரங்கம் ,மேற்றிமக் நினைவகம் பாலம் சுரங்கம் ,நதி சுரங்கங்கள் ,எலிசபெத் நதி சுரங்கங்கள் ,நகர சுரங்கம் ,மிட் டவுன் சுரங்கம் ,யார்க் கவுண்டி ,ஃபெண்டன் ஆலை சாலை ,மேற்றிமக் பாதை ,உயர் உயர்வு பாலம் விரிவாக்கம் ,தெற்கு இராணுவம் நெடுஞ்சாலை ,கிரீன் பிரையர் பூங்கா ,மேம்பாடுகள் ப்ராஜெக்ட் ,வர்ஜீனியா கடற்கரை ,புதிய நகரம் சாலை ,கிரேசன் சாலை ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.