3.49
True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 76% and 83% of the drill intercept.
Drill holes CMLP-20-146 & CMLP-20-150 were both drilled outside of the existing resource polygon. Drilling was performed to test the “Guatuza extension” of the North Block as it shows continuity of the mineralization of the North block in the direction of the Guatuza zone.
Drill holes CMLP-20-165 & CMLP-20-167 which were exploratory holes drilled between the South and the North Block, reported additional intercepts which demonstrates the continuity of massive sulfides mineralization between the two known blocks.