Crews will close the Interstate 77 southbound bridge over the Catawba River at 9 p.m. May 6. It will remain closed for 17 days to replace to concrete road surface on the structure. Southbound traffic will share the northbound bridge, and what is typically four lanes of traffic each way will be cut down to two lanes.