Excellent high-grade intercepts from the first batch of results from the Phase 3 drill program include the thickest, highest grade intercepts to date.
The results continue to highlight the consistent grade and thickness of mineralization over ~3.6km strike length, and the potential to rapidly define a large, critical mineral resource at the Titan Project.
The remaining 40 Phase 3 drill holes and further heavy mineral assemblage samples are currently with SGS for analysis. A maiden mineral resource estimate in accordance with the JORC Code is expected in Q3 2021.
New assays received from 38 holes of the Phase 3 drill program continue to show thick, high grade intercepts of Total Heavy Minerals (“THM”), including: