FAR Limited has completed a review of the prospectivity of the A2 and A5 blocks offshore The Gambia, following the Bambo drilling campaign in late 2021. FAR will commence a farm-down of its interest in blocks A2 and A5 and in doing so, seek a carry on the cost of a well for drilling in late 2023 and a contribution to FAR’s past costs.