Galleon Gold Corp.: Galleon Gold Extends Gold Mineralization at West Cache Project
East Pit Extension- drilling confirms and extends easterly trend
Eight new core holes, completed to an average depth of 200 meters, were drilled at and beyond the eastern edge of the projected East Pit area with the goal of extending several known gold zones (Figures 1 and 2). This latest drillhole array was particularly successful in confirming lateral and vertical projections with inferred near surface potential. Highlights from some of the East Pit area holes, shown in the following bullets, provide the latest data projecting a 350-meter eastward extension of the East Pit mineralization, while emphasizing the need for additional drilling immediately to the south and east. Importantly, the latest results show strong potential to continue to add incremental gold resources to the eastern end of the Company's 2013 resource base.