The construction of the underwater power cable will be the largest bilateral energy project ever undertaken by Germany and the UK. The 450-mile-long “NeuConnect interconnector” will link the German transmission grid at Wilhelmshaven with its counterpart at Isle of Grain, a village on Medway’s Hoo Peninsula. When completed in the mid-2020s, the power link will