Share:
Elim Mining Incorporated ("Elim" or the "Company"), a private copper exploration and development company, is pleased to report results from five (5) diamond drill holes as part of the 2020 mineral resource definition drilling program at its Cactus West porphyry copper project located in Pinal County, Arizona (see
FIGURES 1-2 and TABLE 1 below). Together with the previously released 8 diamond drill holes (November 17, 2020), Elim has now released the results for 13 of the total 17-hole drilling program, with results for the remaining four holes pending. An 18
th hole (1,697 ft, 517 m) was completed to support column leach test work as part of metallurgical studies to determine leach parameters for Cactus West and East and the Stockpile Project. This completes the planned 2020 Cactus drilling program of 17 diamond drill holes totaling 6,974 ft (2,125.7 m).