The U.S. Army Corps of Engineers’ reevaluation report on a proposed Ala Wai Canal flood control project contains one big surprise: The project’s full estimated cost has ballooned above $1 billion — more than 50% higher than a $651 million estimate made just two years ago that caused the city to flinch and call for re-evaluation, and three times the estimated cost in 2017.