some of this water back into the condenser pools to try to manage it and also try to bring more water containment tanks back on the sito they can pump it into places where they can store and not have it leak out of the system. >> from your professional sta standpoint, given the fact that the reactors are still damaged that fukushima site. we'll talk about this and the repair work that goes on there for a year now? >> if we talk about the repair work is probably too strong a word. i would say that the decommissioning work would go on for several years, actually. i think the most major thing in this timeline, though, is controlling the radiation leaks both into the ocean and into the atmosphere. this seems to be the major issue. and all these volumes of water that they've used to try to cool the plants during this period. >> can we talk about, james, the engineers that are also trying to figure out how to store 60,000 tons of highly