Designs for the $3.5 million renovation of Lake Thoreau pool were approved by the Reston Association Design Review Board last night (June 22), keeping the project on track for construction in the fall. The board ratified several key design elements, including a re-working of the roof, ADA access with a ramp into the main pool,