In compliance to the directives of Prime Minister of Pakistan Shahbaz Sharif and Federal Minister for Energy Engr. Khurram Dastgir Khan, the National Transmission and Despatch Company Limited (NTDC) has completed the construction work of 29 km long, double-circuit transmission line from Polan to Gwadar.