BW Energy starts production from second Hibiscus / Ruche well BW Energy is pleased to announce that production has safely started from second well of the Hibiscus / Ruche Phase 1 development in the Dussafu licence offshore Gabon. Production performance from the well has been in line with expectations and is currently stabilised at approximately 6,000 barrels per day. The DHIBM-4H well was drilled as a horizontal well from the BW MaBoMo production facility to a total depth of 4,800 metres into Ga