Argo Gold Inc.: Argo Gold Commences Exploration at the Uchi Gold Project
CSE: ARQ) (
OTCQB: ARBTF) ("
Argo Gold") commenced surface exploration at the Uchi Gold Project in April 2021, and the bedrock stripping, trenching, washing, geological mapping and channel sampling will continue in phases at the Uchi Gold Project throughout the 2021 field season. Argo Gold also confirms that a 2500 metre drill program will commence at the Uchi Gold Project in late May 2021.
The 2020 field season identified high-grade gold mineralization at Northgate and Woco, located in the main mineralized trend; as well as at Raingold on the HST Zone, a parallel mineralized trend located west of the main Northgate-Woco trend. Argo Gold's December 1, 2020 news release summarized the results of this program that indicated pervasive gold mineralization on multiple mineralized trends.