In most places where metro viaducts are erected, traffic flows on both sides of the median. With the median at the centre, the space remains unutilised. With the portal pier design, traffic will flow on both sides and under the viaduct. The central lane under the twin flyover near Doddanekundi is expected to be completed soon and is likely to be open to traffic by next week.