Published May 27, 2021, 12:52 PM
Aboitiz Construction on Wednesday, (May 26) announced it has finished the design and construction of Berth no. 4 for Davao International Container Terminal (DICT) in Panabo City, Davao del Norte.
The DICT is one of the most modern ports in the country and the project is an extension of Aboitiz’ previous construction of Berths 1-3.
The length of the DICT Berths totals 600 meters. They can moor 3 units of Post Panamax vessels.
Berth no. 4 alone is a 33-meter wide and 177-meters long structure, with a connecting bridge access and a mooring Dolphin.
In all, Aboitiz installed 1,965 pieces of precast pile cap, beams, girder and t-beams using a couple of barges and 4 cranes.