comparemela.com


Photo: Supplied / West Coast Regional Council
The council has included the Westport project in its 2021- 2031 long term plan which is yet to be released to the public.
But Beal said the scheme involved extensive stopbanks and floodwalls - essentially ringfencing the town from the Buller and Orowaiti rivers and would cost $10.2 million.
"It is designed for a one-in-a-100-year flood in the Buller ... and whether it would have protected the town this time, the simple answer is yes, unless there was a flood bank failure," Beale said.
"There would likely still have been surface flooding damage to some properties from storm water but not to the same extent or over widespread areas."

Related Keywords

Jamie Cleine ,Randal Beal ,Franz Josef ,Pat Odea ,Coast Regional Council ,Regional Council ,Flooding At Buller High School ,Buller High School ,West Coast Regional Council ,Mayor Jamie Cleine ,High School ,Westport Mayor Pato Dea ,Buller River ,O Conor Home ,ரேண்டல் பீல் ,ஃப்ரான்ஸ் ஜோஸெஃப் ,கடற்கரை பிராந்திய சபை ,பிராந்திய சபை ,புல்லர் உயர் பள்ளி ,மேற்கு கடற்கரை பிராந்திய சபை ,உயர் பள்ளி ,புல்லர் நதி ,ஓ கோனார் வீடு ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.