comparemela.com

Latest Breaking News On - பாறை லெஃப்ரான் - Page 1 : comparemela.com

Orea Signs Binding Term Sheet to Acquire Gold Project in Suriname

Orea Signs Binding Term Sheet to Acquire Gold Project in Suriname
prnewswire.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from prnewswire.com Daily Mail and Mail on Sunday newspapers.

Orea Completes 8 Drill Holes at the Maripa Gold Project, French Guiana, France

Orea Completes 8 Drill Holes at the Maripa Gold Project, French Guiana, France News provided by Share this article  Orea Mining Corp. (  is pleased to report on the 2020 drilling program at the Maripa gold project ( Maripa ) located in French Guiana, France. 8 diamond drill holes were completed to date on the Maripa exploration permit; 6 of the 8 drill holes served to test the depth and lateral extent of 3 gold mineralized shear-hosted vein systems traced at surface; 4 drill holes intersected wide shear zones marked by quartz veining, strong hydrothermal alteration, and sulfide mineralization over 18 to 27 meters; Re-sampling of historical core of drill hole MAR-06-008 confirmed original results with new results averaging 4.07 g/t gold over 36 meters;

Orea Completes Montagne d Or Gold Project Modifications

Orea Completes Montagne d Or Gold Project Modifications News provided by Share this article Orea Mining Corp. (   Company )  (TSX: OREA) (OTCQX: OREAF) (FRA: 3CG) is pleased to announce the completion of additional engineering and environmental studies for the development of the Montagne d Or gold mine in French Guiana, France. This is a major milestone for permitting of Montagne d Or, one of the top undeveloped gold deposits in the Guiana Shield commented Rock Lefrançois, President & CEO of Orea. The Montagne d Or joint-venture (owned 44.99% by Orea and 55.01% by Nord Gold SE) launched additional engineering and environmental studies in early 2019 for project modifications and improvements subsequent to the bankable feasibility study completed in 2017 and public consultation held in 2018. The studies principally addressed mine design, access road layout, hybrid on-site power generation and quarry development for construction material. They also included additional fau

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.