A
Private Investor is a recipient of the information who meets all of the conditions set out below, the recipient: 1. Obtains access to the information in a personal capacity; 2. Is not required to be regulated or supervised by a body concerned with the regulation or supervision of investment or financial services; 3. Is not currently registered or qualified as a professional securities trader or investment adviser with any national or state exchange, regulatory authority, professional association or recognised professional body; 4. Does not currently act in any capacity as an investment adviser, whether or not they have at some time been qualified to do so;
UK: Serica Energy spuds Columbus development well in the UK Central North Sea
17 Mar 2021
Serica Energy has announced the spud of the
Columbus 23/16f-CDev1 development well in the UK Central North Sea which will be drilled to a total depth of 17,600ft and will include a 5,600ft horizontal section. The well is being drilled with the Maersk Resilient Heavy Duty Jack Up rig and is expected to take around 70 days.
Serica Energy spuds Columbus development well in the UK Central North Sea
Map Source: Serica Energy
The Columbus development area is 35km north east of the Shearwater production facilities and will be drained by a single producing well tied into the existing Arran to Shearwater pipeline. A recent Competent Person’s Report estimates the Columbus gross undeveloped 2P reserves to be in excess of 14 million barrels of oil equivalent ( boe ).
Serica Energy plc : Columbus Development Well Spud
édité le 17/03/2021 - Plus de news de Serica Energy - Voir la fiche entreprise de Serica Energy
Serica Energy plc is pleased to announce the spud today of the Columbus 23/16f-CDev1 development well in the UK Central North Sea which will be drilled to a total depth of 17,600ft and will include a 5,600ft horizontal section. The well is being drilled with the Maersk Resilient Heavy Duty Jack Up rig and is expected to take around 70 days.
The Columbus development area is 35km north east of the Shearwater production facilities and will be drained by a single producing well tied into the existing Arran to Shearwater pipeline. A recent Competent Persons Report estimates the Columbus gross undeveloped 2P reserves to be in excess of 14 million barrels of oil equivalent (boe).
Serica kicks off drilling on Covid-delayed Columbus project - News for the Oil and Gas Sector energyvoice.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from energyvoice.com Daily Mail and Mail on Sunday newspapers.