GoldMining Reports New Mineral Resource Estimates for Titiribi and La Mina Projects, Colombia prnewswire.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from prnewswire.com Daily Mail and Mail on Sunday newspapers.
Canada Nickel Preliminary Economic Assessment Confirms Robust Economics of Crawford Nickel Sulphide Project
News provided by
Share this article
8% and 16% after-tax IRR
First quartile net C1 cash cost of $1.09/lb and net AISC of $1.94/lb of nickel
Production of 1.9 billion pounds nickel over 25 years
Annual EBITDA of $439 million and annual free cash flow of $274 million
Immediately advancing to feasibility study
(All amounts in US dollars unless otherwise indicated.)
TORONTO, May 25, 2021 /PRNewswire/ -
Canada Nickel Company Inc. ( Canada Nickel or the Company ) (TSXV: CNC) (OTCQB: CNIKF), is pleased to announce that the Preliminary Economic Assessment ( PEA ) has confirmed robust economics showing an after-tax NPV
Astro Resources updates heavy mineral resource estimate at Governor Broome Project in Western Australia
The new estimates are for three areas - Governor Broome West, East and South - which are within R70/53 held by Governor Broome Sands Pty Ltd, a wholly-owned subsidiary of Astro. The estimates are based on results from Astro drilling in 2020 and 2012 along with drilling by Metal Sands from 2005 to 2007.
Astro Resources NL (ASX:ARO) has updated the resources at the Governor Broome Heavy Minerals Project within 100%-owned Retention Licence R70/53 to total 52 million tonnes at 4.6% heavy mineral (HM) of indicated resources and 6 million tonnes at 4.5% HM of inferred resources.
Home » Internet » Amended and Restated NI 43-101 Technical Report on the Mineral Resource Estimates Crawford Nickel-Cobalt Sulphide Project:
Amended and Restated NI 43-101 Technical Report on the Mineral Resource Estimates Crawford Nickel-Cobalt Sulphide Project: Posted by PublisherInternet Monday, 18. January 2021
Canada Nickel Company Inc. (TSX-V: CNC) (\”Canada Nickel\” or the \”Company\” – https://www.commodity-tv.com/play/canada-nickel-ceo-update-on-glencore-deal-pea-and-pfs-by-year-end/ ?is pleased to announce the filing on SEDAR of an amended and restated independent National Instrument 43-101 ? Standards of Disclosure for Mineral Projects (\”NI 43-101\”) entitled: \”Independent Technical Report and Mineral Resource Estimates Crawford Nickel-Cobalt Sulphide Project: Main Zone (Update) and East Zone (Initial) Deposits\” prepared by Scott Jobin-Bevans (Ph.D., PMP, P.Geo.), John Siriunas (M.A.Sc., P.Eng.) and David Penswick (P.Eng.) (the \”Amended Techn
Canada Nickel or the
Company ) is pleased to announce the filing on SEDAR of an amended and restated independent National Instrument 43-101 –
Standards of Disclosure for Mineral Projects (
NI 43-101 ) entitled: Independent Technical Report and Mineral Resource Estimates Crawford Nickel-Cobalt Sulphide Project: Main Zone (Update) and East Zone (Initial) Deposits prepared by Scott Jobin-Bevans (Ph.D., PMP, P.Geo.), John Siriunas (M.A.Sc., P.Eng.) and David Penswick (P.Eng.) (the
Amended Technical Report ).
The Amended Technical Report can be found under the Company s profile at www.sedar.com. The Amended Technical Report has been filed further to a review by staff of the Ontario Securities Commission (the